Wednesday, February 18, 2026
  • REPORT A STORY
  • PRIVACY POLICY
  • CONTACT
WITHIN NIGERIA
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)
No Result
View All Result
WITHIN NIGERIA
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)
No Result
View All Result
WITHIN NIGERIA
No Result
View All Result
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE

Makinde accuses Ajimobi of awarding N7bn road project to ‘faceless’ contractor

by Adejayan Gbenga Gsong
July 4, 2019
in National
Reading Time: 1 min read
A A
0
Share on FacebookShare on Twitter

Governor Seyi Makinde of Oyo State has accused his predecessor, Senator Abiola Ajimobi of awarding contracts to a contractor with an untraceable office address to the tune of N7 billion.

It was reported that the contract was for the construction of the Moniya-Iseyin Road, Ojedeji Village in Akinyele local government of the state.

The governor spoke yesterday after he embarked on a tour of the road leading to the Pacesetter Quarry and Asphalt plant, located at Km 25, Moniya-Iseyin Road.

He said that N2 billion of the total contract sum was paid to the unknown contractor.

READ ALSO

What Students must do before sitting for CB‑WASSCE in 2026

SECURITY WATCH: 316 lives lost to armed attacks 71 days after Tinubu’s emergency on security

SMART EARNINGS: Five online gigs Nigerians can explore for extra cash in 2026

AIR SAFETY REVIEW: Strengthening Nigeria’s aviation sector beyond basic regulations

INSIGHT: Real-time transmission of results rejected — who gains and who loses?

Explaining his level of disappointment, the governor lamented that the road, which served as the economic route for farm and agricultural produce into the state, could be abandoned after the faceless contractor collected N2 billion, with little or nothing to show for it on the project site.

He said his effort at locating the site address of the contractor to interact with them on the level of work done despite the amount of money released, revealed that the given office address was not only untraceable but the name could not be ascertained.

Makinde said: “My impression of the work done so far if I will have to evaluate and cost it, couldn’t have been more than N150 million.

“It was a faceless contractor and we don’t even know where their offices are located. I could have stopped by to go discuss with them but there is nowhere to stop by,” he added.

RELATED STORYPosts

CB‑WASSCE for students in 2026
National

What Students must do before sitting for CB‑WASSCE in 2026

by Samuel David
February 16, 2026
National

SECURITY WATCH: 316 lives lost to armed attacks 71 days after Tinubu’s emergency on security

by Abdulsalam Abdullah
February 16, 2026

Discussion about this post

JUST IN

El-Rufai and Ribadu: Blurring the lines of genuine activism and unsettling rabble-rousing

by Afolabi Hakim
22:04 Feb 16, 2026

He however needs to know that there should be a limit to…

WITHIN NIGERIA

WITHIN NIGERIA MEDIA LTD.

NEWS, MULTI MEDIA

WITHIN NIGERIA is an online news media that focuses on authoritative reports, investigations and major headlines that springs from National issues, Politics, Metro, Entertainment; and Articles.

Follow us on social media:

CORPORATE LINKS

  • About
  • Contacts
  • Report a story
  • Advertisement
  • Content Policy
  • Privacy Policy
  • Terms
 
  • Fact-Checking Policy
  • Ethics Policy
  • Corrections Policy
  • WHO IS WITHIN NIGERIA?
  • CONTACT US
  • PRIVACY
  • TERMS

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName

No Result
View All Result
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName