Sunday, December 7, 2025
  • REPORT A STORY
  • PRIVACY POLICY
  • CONTACT
WITHIN NIGERIA
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)
No Result
View All Result
WITHIN NIGERIA
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)
No Result
View All Result
WITHIN NIGERIA
No Result
View All Result
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE

Lagos govt to close Marine Bridge from 8pm to 8am daily for five months

by Adejayan Gbenga Gsong
March 27, 2020
in National
Reading Time: 1 min read
A A
0
Lagos govt to close Marine Bridge from 8pm to 8am daily for five months
Share on FacebookShare on Twitter

The Lagos State government on Friday said it would close the Marine Bridge, partially between 8.00p.m and 8.00a.m daily from March 28 to August 15 for repair.

The Public Affairs Unit of the state Ministry of Transportation made this known in a statement in Lagos.

It said that the construction works by the Federal Ministry of Works and Housing would replace the worn-out Elastomeric Bearing and Expand the Metallic joints on the bridge.

The statement said that other repair works included construction of drain gully, jacketing, skin repairs of the piers and laying of asphalt.

READ ALSO

Tax Reform 2025: What’s Really Happening with Our Savings and Investments?

Inside the 2025 YEIDEP Labyrinth: ₦50K to ₦500K — But Who Truly Gets It?

Political Appointments that steered Nigeria in 2025

How NYSC Camps became Nigeria’s fast track Police training grounds in late 2025

Why Nigeria’s Oil Sector revenue sharing formula faces renewed scrutiny in 2025

“The repair works, which will take duration of 20 weeks, would be done in two phases to ease traffic movements.

“The first half of the construction works will last for the first 10 weeks; thereafter, the second half would commence equally and last for 10 weeks.

“The closure has been slated for between 8.00p.m and 8.00a.m daily to ensure there is smooth and uninterrupted flow of the repair works.

“Therefore, road users are advised to comply with the traffic diversions to minimise inconveniences in movements, as they will be allowed to ply only the available sides of the roads while the construction works lasts,” it said.

According to it, the Lagos State government appeals to residents of the state, especially motorists plying the corridor to bear the pains.

While adding that the project was being executed for the safety of residents and seamless movement that would meet the transportation needs of the larger populace.

RELATED STORYPosts

Tax Reform
National

Tax Reform 2025: What’s Really Happening with Our Savings and Investments?

by Samuel David
December 7, 2025
YEIDEP
National

Inside the 2025 YEIDEP Labyrinth: ₦50K to ₦500K — But Who Truly Gets It?

by Samuel David
December 7, 2025

Discussion about this post

JUST IN

Osun gubernatorial election and a state’s peculiar theatrics

by Afolabi Hakim
21:55 Dec 6, 2025

The year 2027 is a most momentous and foreboding one for people…

WITHIN NIGERIA

WITHIN NIGERIA MEDIA LTD.

NEWS, MULTI MEDIA

WITHIN NIGERIA is an online news media that focuses on authoritative reports, investigations and major headlines that springs from National issues, Politics, Metro, Entertainment; and Articles.

Follow us on social media:

CORPORATE LINKS

  • About
  • Contacts
  • Report a story
  • Advertisement
  • Content Policy
  • Privacy Policy
  • Terms
 
  • Fact-Checking Policy
  • Ethics Policy
  • Corrections Policy
  • WHO IS WITHIN NIGERIA?
  • CONTACT US
  • PRIVACY
  • TERMS

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName

No Result
View All Result
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName