Friday, December 5, 2025
  • REPORT A STORY
  • PRIVACY
  • CONTACT US
WITHIN NIGERIA - NEWS PICKS
  • HOME
  • FEATURES
  • NEWS PICKS
    • BREAKING
    • National
    • Local News
    • Politics
    • Diaspora
    • Business
    • Education
    • Sports
    • World News
      • Africa
      • U.S
      • Asia
      • Europe
    • XTRA
  • ENTERTAINMENT
  • MORE
    • GIST
    • ARTICLES
    • VIDEOS
No Result
View All Result
WITHIN NIGERIA - NEWS PICKS
No Result
View All Result
  • HOME
  • FEATURES
  • NEWS PICKS
  • ENTERTAINMENT
  • MORE

Policy Think Tank Defends Cost of Lagos-Calabar Highway, Criticizes Atiku’s Claims

The group maintains that the projected cost of the highway construction is justified

paulcraft by paulcraft
April 18, 2024
in National
Reading Time: 2 mins read
0 0
A A
0
Lagos-Calabar coastal highway
Share on FacebookShare on Twitter
  • IMPI defends proposed N2.8 trillion budget for Lagos-Calabar highway, refuting Atiku’s criticisms and asserting justification for project cost
  • Group highlights successful track record of project handling firm and cites global road project costs to support highway budget

The Independent Media and Policy Initiative (IMPI), a think tank of policy analysts, has defended the proposed N2.8 trillion budget for the construction of the Lagos-Calabar coastal highway, dismissing criticisms from former Vice President Atiku Abubakar.

According to IMPI Chairman Niyi Akinsiju, the group maintains that the projected cost of the highway construction is justified. They refute Atiku’s objections, asserting that ample evidence supports the cost estimation of the ambitious project.

In a statement released in Abuja on Wednesday, IMPI refuted Atiku’s assertions, labelling them as attempts to discredit the project without a valid basis. The group pointed to the successful track record of the project handling firm, particularly in constructing coastal highways with reinforced concrete, citing the Bar Beach Shoreline protection as an example.

On Atiku’s criticism of the project’s cost, the policy group insisted that a cost analysis of road projects similar to the Lagos-Calabar highway in some parts of the world showed that the project’s cost was appropriate.

READ ALSO

Rivers Speaker, 15 other assembly members loyal to Wike quit PDP, join APC

Insecurity: VIPs’ protection, a presidential order and a nation’s broken police system

New dawn at the defence ministry: Christopher Musa and the burden of expectations

Tinubu’s jarring ambassadorial nominee list and the place of optics in governance

“We note that there is no unified standard pricing template for building a kilometre of road anywhere in the world. The realities of road building depend on several variables: location, terrain, type of construction, number of lanes, lane width, surface durability, and the number of bridges.

“Yet, for engagement, we reviewed some cost estimates in some other countries to establish the context of fraud or otherwise that Waziri Abubakar is trying to throw up.

“To build a 2-lane road of 12 metres wide of each lane with no bridges in states of North Eastern United States of America is $3.34m per km (when converted to Naira using the N1200/$ adopted by Umahi, it comes to N4.08bn per km) while the same 2-lane road in South Eastern USA with no bridges is $ 3.78m per km (N4.53bn per km)

“According to the Texas Department of Transportation, the average cost of building a concrete road in rural areas is around $2.5m per mile, while in urban areas it can cost upwards of $5m per mile.

“In California, the estimated cost of building a concrete road ranges from $3 million to $6 million per mile, depending on the location and other factors. In Australia, average road project costs were around $5.1m (N6.12bn) per lane kilometre in 2017.

“But in Bangladesh, according to the World Bank, the estimated cost of construction is $6.6m (N7.92bn) per kilometre for the Rangpur-Hatikumrul highway, $7m (N8.4bn) per kilometre for Dhaka-Sylhet highway, $11.9 million (N14.28 billion) per kilometre for Dhaka-Mawa highway. This underscores cost differentials in road construction because of peculiarities in terrains.

“These figures are far higher than the N4.329 billion per kilometre of 10 lanes Coastal Road with very peculiar terrains that Umahi says Hitech has commenced construction of.

“For clarity, a technical analysis of the features of the road will suffice: The Lagos-Calabar Coastal Road is designed to be 10 lanes with a total pavement of 59.2 metres with 100 metres corridor. Of this corridor, there will be five lanes on the right and five lanes on the left. This comes with a 25-metre train track.”

Discussion about this post

ADVERTISEMENT
NEWS PICKS — WITHIN NIGERIA

WITHIN NIGERIA MEDIA LTD.

NEWS, MULTI MEDIA

WITHIN NIGERIA is an online news media that focuses on authoritative reports, investigations and major headlines that springs from National issues, Politics, Metro, Entertainment; and Articles.

Follow us on social media:

CORPORATE LINKS

  • About
  • Contacts
  • Report a story
  • Advertisement
  • Content Policy
  • Privacy Policy
  • Terms
 
  • Fact-Checking Policy
  • Ethics Policy
  • Corrections Policy
  • REPORT A STORY
  • PRIVACY
  • CONTACT US

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • HOME
  • FEATURES
  • NEWS PICKS
    • BREAKING
    • National
    • Local News
    • Politics
    • Diaspora
    • Business
    • Education
    • Sports
    • World News
      • Africa
      • U.S
      • Asia
      • Europe
    • XTRA
  • ENTERTAINMENT
  • MORE
    • GIST
    • ARTICLES
    • VIDEOS

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName