Sunday, December 28, 2025
  • REPORT A STORY
  • PRIVACY POLICY
  • CONTACT
WITHIN NIGERIA
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)
No Result
View All Result
WITHIN NIGERIA
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)
No Result
View All Result
WITHIN NIGERIA
No Result
View All Result
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE

Amaechi apologises to Nigerians for Abuja-Kaduna train breakdown

by Adejayan Gbenga Gsong
November 24, 2020
in National
Reading Time: 2 mins read
A A
0
Share on FacebookShare on Twitter

Minister of Transportation Rotimi Amaechi has apologised to Nigerians for the breakdown on the Abuja-Kaduna rail locomotives which occurred between November 18 and November 20.

The minister made the plea on Monday at the Moniya rail station during the routine inspection of the ongoing rail project in Ibadan.

“I want to apologise to Nigerians over what happened at the Abuja-Kaduna rail station.

“We now have new locomotives and we have called the Chinese because we never expected the mechanical fault at this early stage.

READ ALSO

End of year bonuses and state finances: A look at 13-month salary approvals

REALITY CHECK: Inside the daily hardships faced by cemetery workers in Lagos

From Death Row to Christmas Freedom: The Story of Sunday Jackson, an Adamawa-Born Farmer Who Killed a Herder in Self-Defense

Why Soyinka’s protest still matters as Nigerians face new U.S. Immigration barriers

From Hero to Target: Is Ribadu’s Time Up?

“On behalf of the Federal Government, the ministry and the Nigerian Railway Corporation (NRC), we apologise to Nigerians and I have instructed the NRC to fix it or invite the Chinese.

“If this is happening now, then they should bring back our old locomotives, it will just affect turnaround times because we get the new locomotive to increase the turnaround time,” he said.

Amaechi called for an increase in the pace of work by the China Civil Engineering Construction Corporation (CCECC) adding that Covid-19 pandemic was no longer an excuse.

The minister said although the CCECC were doing well, they need to increase their pace to enable the ministry to deliver the project on schedule.

The Permanent Secretary, Federal Ministry of Transportation, Mrs Madeleine Ajani, said there was a significant improvement in the ongoing work from what it was in October.

Ajani said the ministry was not shifting their date of the commissioning but would rather put more pressure on the CCECC to enable them to achieve their targets.

She explained the need for Lagos to have standard gauge train due to the population adding that in less than one and a half hours that the train would move from Lagos to Ibadan.

Ajani said that the establishment of the Standard gauge railway would also decongest both the road transportation and movement of cargo from the ports while people living in Ibadan could come and work in Lagos on a daily basis

The Managing Director, Nigeria Railway Corporation, Mr Fidet Okhiria, said there was an improvement in the construction output by the contractors adding ”hopefully by December some of the stations would be completed’’.

“We also need to have more stations so that passengers will not need to wait for the train to leave Ebute-Meta Station before getting to Agege station which means that the two trains can be in a section.

“This can be done with the help of signal and communication hence train should be able to communicate with train as well as station should be able to communicate with station simultaneously.

“The delay in the rail construction along Apapa ports corridors is due to the Oando pipeline along Apapa corridor,” Okhiria said.

He disclosed that the train would start operating from Lagos to Moniya in Ibadan by Dec. 7.

According to Okhiria, 24 coaches, four passenger locomotives, nine freight locomotives and shunting locomotives had arrived Lagos while two of the freight locomotives would be transferred to Warri for a project.

RELATED STORYPosts

Nigerian State Governors who approved 13-month salary
National

End of year bonuses and state finances: A look at 13-month salary approvals

by Samuel David
December 27, 2025
National

REALITY CHECK: Inside the daily hardships faced by cemetery workers in Lagos

by W.N YEMI
December 26, 2025

Discussion about this post

JUST IN

Malami and his grand larceny — A feature, not a bug, of the Nigerian system

by Afolabi Hakim
12:19 Dec 26, 2025

The truth is that Malami is a product of a system that…

WITHIN NIGERIA

WITHIN NIGERIA MEDIA LTD.

NEWS, MULTI MEDIA

WITHIN NIGERIA is an online news media that focuses on authoritative reports, investigations and major headlines that springs from National issues, Politics, Metro, Entertainment; and Articles.

Follow us on social media:

CORPORATE LINKS

  • About
  • Contacts
  • Report a story
  • Advertisement
  • Content Policy
  • Privacy Policy
  • Terms
 
  • Fact-Checking Policy
  • Ethics Policy
  • Corrections Policy
  • WHO IS WITHIN NIGERIA?
  • CONTACT US
  • PRIVACY
  • TERMS

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName

No Result
View All Result
  • HOME
  • FEATURES
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • MORE
    • VIDEOS
    • GIST
    • PIECE (ARTICLES)

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName