Saturday, December 6, 2025
  • REPORT A STORY
  • PRIVACY
  • CONTACT US
WITHIN NIGERIA - NEWS PICKS
  • HOME
  • FEATURES
  • NEWS PICKS
    • BREAKING
    • National
    • Local News
    • Politics
    • Diaspora
    • Business
    • Education
    • Sports
    • World News
      • Africa
      • U.S
      • Asia
      • Europe
    • XTRA
  • ENTERTAINMENT
  • MORE
    • GIST
    • ARTICLES
    • VIDEOS
No Result
View All Result
WITHIN NIGERIA - NEWS PICKS
No Result
View All Result
  • HOME
  • FEATURES
  • NEWS PICKS
  • ENTERTAINMENT
  • MORE

Bridge Construction: Lagos govt to divert traffic at Iyana-Era road for one year

Adejayan Gbenga Gsong by Adejayan Gbenga Gsong
September 22, 2021
in National
Reading Time: 1 min read
0 0
A A
0
Share on FacebookShare on Twitter

The Lagos State Government has said that it would divert traffic at Iyana-Era road for one year to rehabilitate and construct a 20metre bridge.

The state Ministry of Transportation said in a statement that the road work would commence midnight Friday September 24 for a duration of 12 months.

Frederic Oladeinde, commissioner for transportation, explained in the statement that the construction was pertinent to address the factors responsible for the rapid and frequent deterioration of the section of the road.

Mr Oladeinde said the portions before and after the existent culverts submerged into the surrounding swamp, hence the need for a bridge.

READ ALSO

Rivers Speaker, 15 other assembly members loyal to Wike quit PDP, join APC

Insecurity: VIPs’ protection, a presidential order and a nation’s broken police system

New dawn at the defence ministry: Christopher Musa and the burden of expectations

Tinubu’s jarring ambassadorial nominee list and the place of optics in governance

The commissioner further explained that motorists heading towards Shibiri, Ajangbadi and Igbogbo axis would be diverted at Era-Adaloko roundabout into a Contra flow on the Badagry bound lane to minimise the inconveniences during the course of the repairs.

Mr Oladeinde further stated that the state’s Traffic Management Agency, LASTMA, would be fully on the ground to direct traffic in addition to traffic guides which will be strategically placed to guide vehicular movement during the stipulated period.

The state government, while seeking residents’ cooperation for the successful commencement and completion of the project, reiterated its continuous commitment towards the development of transport infrastructure across the metropolis.

Mr Oladeinde, however, maintained that it was vital for the Multi-Modal Transportation System of the state government which would turnout to boost the economic prowess of the citizenry.

Discussion about this post

ADVERTISEMENT
NEWS PICKS — WITHIN NIGERIA

WITHIN NIGERIA MEDIA LTD.

NEWS, MULTI MEDIA

WITHIN NIGERIA is an online news media that focuses on authoritative reports, investigations and major headlines that springs from National issues, Politics, Metro, Entertainment; and Articles.

Follow us on social media:

CORPORATE LINKS

  • About
  • Contacts
  • Report a story
  • Advertisement
  • Content Policy
  • Privacy Policy
  • Terms
 
  • Fact-Checking Policy
  • Ethics Policy
  • Corrections Policy
  • REPORT A STORY
  • PRIVACY
  • CONTACT US

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • HOME
  • FEATURES
  • NEWS PICKS
    • BREAKING
    • National
    • Local News
    • Politics
    • Diaspora
    • Business
    • Education
    • Sports
    • World News
      • Africa
      • U.S
      • Asia
      • Europe
    • XTRA
  • ENTERTAINMENT
  • MORE
    • GIST
    • ARTICLES
    • VIDEOS

© 2022 WITHIN NIGERIA MEDIA LTD. designed by WebAndName