Friday, 7 Aug 2026
  • My Feed
  • My Interests
  • My Saves
  • History
  • Latest Updates
Subscribe
WITHIN NIGERIA
  • HOME
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • 🔥
  • FEATURES
  • POLITICS
  • SPECIAL REPORTS
  • ANALYSIS
  • SPORTS
  • NOLLYWOOD
  • EDUCATION
  • OPINION
  • BUSINESS
  • LIFESTYLE
  • HEALTH
  • TECHNOLOGY
  • PRESS RELEASE
Font ResizerAa
WITHIN NIGERIAWITHIN NIGERIA
  • HOME
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
Search
Have an existing account? Sign In
Follow US
© WITHIN NIGERIA MEDIA LTD. All Rights Reserved.
National

Boko Haram destroys Borno power station, throws residents into darkness

Last updated: June 29, 2019 7:34 am
OGBENI .O
Share
Boko Haram members
SHARE

The Transmission Company of Nigeria (TCN) has said that Boko Haram insurgents have attacked its 330/132kv transmission substation at Molai in Maiduguri, Borno State, throwing residents into darkness.

A statement by the General Manager (Public Affairs), TCN, Ndidi Mbah,  said that during the attack, two post isolators porcelain units were affected.

Two Hilux vans and one vehicle belonging to a staff of TCN were destroyed while insurgents made away with the third Hilux Van.

Other items destroyed include Hiab truck, computer, monitor and printer in the control room. The windows of the control room and staff house were also shattered by gunshots.

According to the statement, the operator on duty did exceptionally well by opening the transmission lines from the substation and shutting down the station before leaving the substation moments before the insurgents reached the substation.

She said, however, that after the incident, TCN engineers did a thorough check of the substation equipment before power supply was restored.

The company commended efforts of security operatives who have continued to make it possible for its operators to run the substation and appealed that more of them should be deployed to the area, to further boost the morale of workers who have been unrelenting in ensuring that electricity supply is sustained in Maiduguri and environs despite the risks.

According to Mbah, the 330/132/33kv Molai transmission substation was completed and energised on  October 25, 2018 and was also formally commissioned on  Wednesday,  February 13, 2019. The substation comprises 150MVA and 60MVA power transformers which feed Yola Disco customers in Maiduguri and environs.

TAGGED:Boko Haraminsurgency
Share This Article
Email Copy Link Print
ByOGBENI .O
OGBENI OPA is a Digital Marketer, Curator and a Public Relations enthusiast. Mail me at ogbeni.opa@withinnigeria.com. See full profile on Within Nigeria's TEAM PAGE
Previous Article NASA discovers new planet
Next Article 2019 AFCON: Morocco beat Ivory Coast, qualify for round of 16
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
XFollow
InstagramFollow
LinkedInFollow
MediumFollow
QuoraFollow
- Advertisement -
Ad image

You Might Also Like

National

Gbajabiamila appoints 27 more aides

By
Adejayan Gbenga Gsong
National

Zamfara to Introduce Fulfulde in Schools

By
Adejayan Gbenga Gsong
National

Nigerians will get used to petrol deregulation, says Sylva

By
Sodiq Lawal Chocomilo
National

PHOTOS: Awolowo’s Eldest Daughter, Tola Oyediran Laid To Rest

By
Davies Ngere Ify
WITHIN NIGERIA
Facebook Twitter Youtube Rss Medium

About US

 Your instant connection to breaking stories and live updates. Stay informed with our real-time coverage across politics, tech, entertainment, and more. Your reliable source for 24/7 news.

Top Categories
  • World News
  • Opinion
  • Politics
  • Tech
  • Health
  • Travel
Usefull Links
  • Contact Us
  • Advertise with US
  • Complaint
  • Privacy Policy
  • Cookie Policy

© . All Rights Reserved.