Wednesday, 24 Jun 2026
  • My Feed
  • My Interests
  • My Saves
  • History
  • Latest Updates
Subscribe
WITHIN NIGERIA
  • HOME
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
  • 🔥
  • FEATURES
  • POLITICS
  • SPECIAL REPORTS
  • ANALYSIS
  • SPORTS
  • NOLLYWOOD
  • EDUCATION
  • OPINION
  • BUSINESS
  • LIFESTYLE
  • HEALTH
  • TECHNOLOGY
  • PRESS RELEASE
Font ResizerAa
WITHIN NIGERIAWITHIN NIGERIA
  • HOME
  • NEWS
  • ENTERTAINMENT
  • FACT CHECK
Search
Have an existing account? Sign In
Follow US
© WITHIN NIGERIA MEDIA LTD. All Rights Reserved.
National

FEC approves $1.96bn rail contract from Kano-Niger Republic

Last updated: September 24, 2020 7:36 am
Adejayan Gbenga Gsong
Share
FEC approves $1.96bn rail contract from Kano-Niger Republic
SHARE

The federal executive council (FEC) has approved $1.95 billion for the construction of the 248-kilometre Kano to Maradi (Niger Republic) rail line project.

The rail line, which will start from Kano, is to pass through Dambatta, Kazaure, Daura, Mashi, Katsina, Jibia and terminate in Maradi.

Speaking after a meeting presided over by President Muhammadu Buhari on Wednesday, Rotimi Amaechi, minister of transportation, said the council also approved N3 billion for the design, manufacture, supply, testing and commissioning of one railway crane of 150 ton capacity for emergency and recovery of rolling stocks.

“The council approved two memos for the ministry of transportation. The first one is the award of contract for the design, manufacture, supply, testing and commissioning of one railway crane of 150 ton capacity for emergency and recovery of rolling stocks,” he said.

“This is to sort out situations of accident on the track. It is for a total cost of N3,049,544,000.

“The second one is the award of contract for the development of the proposed Kano to Maradi rail line in Niger Republic and to Dutse, the capital of Jigawa, for a total cost of $1,959,744,723.71, inclusive of 7.5% VAT.”

He said the project would assist in the supply of crude oil from Niger Republic to the refinery being built in the border town between both countries.

Also speaking, Babatunde Fashola, minister of works and housing, said the council approved N12 billion for the construction of section two of the Ohafia to Arochukwu road in Abia.

He said the project, with a distance of 45 kilometers, will complement the section one that was awarded in 2018.

“This section comprises Umuahia/Bende/Ohafia road in Abia State and it was approved for construction at N12.088 billion comprising a distance of 45 kilometers to complement Section One which was previously awarded in 2018, that is the section from Bende/Arochukwu to Ohafia which was 19.27 kilometers,” Fashola said.

“So with this award now, the entire length of the road is now under contract with the same contractor and we hope for expeditious execution.”

On his part, Rauf Aregbesola, minister of interior, said FEC approved the purchase of 52 operational vehicles for effective operation of the Nigeria Correctional Service.

He said: “We considered in the council the award of contract for the procurement of 52 number operational Black Maria vehicle to facilitate effective operation in the correctional service as well as ease of movement of awaiting trial inmates from the custodial centres, 247 of them in all to about 5,022 courts in Nigeria.

“The objective is to ensure that the delay associated with the trial of inmate is reduced if not eliminated.”

Godswill Akpabio, minister of Niger Delta Affairs, also disclosed that N745 million was approved for the hiring of additional forensic field auditors for the audit of the Niger Delta Development Commission (NDDC).

“This brings to the total number of field forensic auditors to 16 in addition to the earlier approved Lead Forensic Auditors, messrs Olumiluwa Bashir and Co,” he said.

“These people are now going to be in charge of the nine states of the Niger Delta which has been divided into 16 lots. They will be undertaking the 19 years of audit and also bring out the organigram for the restructuring of the NDDC for better performance in the future.”

TAGGED:FECKano-Niger Republicrail contractTransportation
Share This Article
Email Copy Link Print
ByAdejayan Gbenga Gsong
Adejayan is an award-winning Journalist and Opinion writer with varied experience in Nigeria. Mail me at AdejayanOluwagbenga@withinnigeria.com. See full profile on Within Nigeria's TEAM PAGE
Previous Article BBNaija host reveals how 2020 winner will emerge BBNaija host reveals how 2020 winner will emerge
Next Article Flooding: Boy, 9, drowns in Abia Flooding: Boy, 9, drowns in Abia
Leave a Comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
XFollow
InstagramFollow
LinkedInFollow
MediumFollow
QuoraFollow
- Advertisement -
Ad image

You Might Also Like

COVID-19: No date yet for reopening of schools, says FG
National

FG Releases Guidelines For School Reopening

By
Davies Ngere Ify
National

Atiku, FIRS Lock Horns Over New TSA Collection Agent

By
Sodiq Lawal Chocomilo
National

Oyigbo Killings: I did not order soldiers to shoot residents, Wike declares

By
Sodiq Lawal Chocomilo
BREAKINGNational

BREAKING: Bauchi gov tests negative for COVID-19

By
Adejayan Gbenga Gsong
WITHIN NIGERIA
Facebook Twitter Youtube Rss Medium

About US

 Your instant connection to breaking stories and live updates. Stay informed with our real-time coverage across politics, tech, entertainment, and more. Your reliable source for 24/7 news.

Top Categories
  • World News
  • Opinion
  • Politics
  • Tech
  • Health
  • Travel
Usefull Links
  • Contact Us
  • Advertise with US
  • Complaint
  • Privacy Policy
  • Cookie Policy

© . All Rights Reserved.